- Responsible for manage machines, production on-site in a start-up factory
【Process】
part 1st group: Molding a plate for a chain (Need 1 candidate)
part 2nd group: Molding a pin,bush and roller for a chain (Need 1 candidate)
※Molding machine, Cutting machine
↓
Polishing group: Removing grease from each part of a chain and grinding after a heat treatment (Need 1 candidate)
※Barrel Finishing Machine
↓
Heat-treatment: groupQuenching heat treatment of each parts (Need 1 candidate)
※Heat treatment facilities
↓
Machine group: Inspecting each part of a chain and assembling (Need 1 candidate)
※Assembling machine
【Duties】
- Management of main materials, machine oil, etc.
- Preparation of production operation plans and work management for the team members
- Production volume management, Console.
- Check the status of machines and molds before the operation to ensure stable operation.
- Preparation of production operation plans and work management for the team members
- Production volume control
‐ Movement of finished parts, inventory control
【SCHEDULE】
- 1st Interview during January
- 2nd Interview from 1st of Feb to the middle of Feb
- Final Interview from the middle if Feb to end of Feb face to face ※Depends on Covid situation, because a Japanese manager is preparing to come to Vietnam.
- You will be training in Japan from June 2021
- You will start work in Vung Tau, Vietnam from April 2022